18th August 2022 – Signing ceremony for the development of 860MW Hydro Power Plant in Nepal
Signing ceremony for the development of 860MW Hydro Power Plant in Nepal on 18th August 2022 between Maser Group, Project Owner and Investor
Signing ceremony for the development of 860MW Hydro Power Plant in Nepal on 18th August 2022 between Maser Group, Project Owner and Investor
BIG CONTRACT : Sarawak Shell regional engineering manager (Asia-Pacific) Phil Blomfield, exchanged document with Maser executive director Mohammad Azahan Mat Seddek. Maser was awarded a multi-million-dollar contract on Monday by Sarawak Shell Bhd/Sabah Shell Petroleum Co Ltd. The contract is for the supply of ball valves for various projects and for maintenance requirements for a period …
A consortium led by a wholly owned subsidiary of Tenaga Nasional Bhd beat several others including the likes of Powertek, YTL Power and Sime Darby to win Malaysia’s first open tender power plant, which is a 300mw coal- fired plant located in Lahad Datu, Sabah. In an announcement yesterday, Tenaga said the Economic Planning Unit (EPU) …
Tenaga-led consortium wins Sabah plant project (26/06/2007) Read More »
Siapkan MoU Investasi Kelistrikan LANGSA – Dua perusahaan Malaysia. MASER (M) Sdn Bhd dan SSM Associates Sdn Baht, telah mengakhiri survei ke lokasi Pembangkit Listrik Tenaga Air (PLTA) Waduk Pendada Bireuen pada Senin (26/5) lalu. Wakil Direktur Aceh Landscape Development Centre (ALDEC) Malik Rani mengatakan hal tersebut kepada rakyat Aceh saat ditemui di kantomya, Kamis kemarin. …